Development

Proposed UK datacenters could double national power use

development2026-02-25

Claim

Ofgem predicts 140 proposed UK data center schemes could require 50 GW, potentially doubling Britain's power consumption, while the President announced a rate payer protection pledge requiring hyperscalers to build their own plants.

Reported metric: 50 GW

Reporting date: (not necessarily the event date)

Sources

Attribution and reporting linked by this record; links do not imply independent verification.

Knowledge graphopen in browser →

Reported in
Actor
Evidence for
Supersedes
Referenced by

Cite or correct this record

Suggest a correction — opens a GitHub draft for you to review and submit.